Monitoring of underground water: Necessary step in determining the method for site remediation

Avdalović, Jelena; Miletić, Srđan B.; Ilić, Mila; Milić, Jelena; Šolević-Knudsen, Tatjana; Đurić, Aleksandra; Nešković, Dejan; Vrvić, Miroslav

(Belgrade, Serbia : Engineering Society for Corrosion, 2016)

TY  - JOUR
AU  - Avdalović, Jelena
AU  - Miletić, Srđan B.
AU  - Ilić, Mila
AU  - Milić, Jelena
AU  - Šolević-Knudsen, Tatjana
AU  - Đurić, Aleksandra
AU  - Nešković, Dejan
AU  - Vrvić, Miroslav
PY  - 2016
UR  - http://cherry.chem.bg.ac.rs/handle/123456789/4969
AB  - The object of this study was to investigate the quality of underground water on the location of heating plant 'Novi Beograd' (Serbia). The examination included a system of 10 piezometers (P1, P5, P6, P7, P8, P9, P10, P11, P12, P13), which are constructed in two cycles (P1, P5, P6 and P13 are located at depth of up to 10 m, and P7 to P12 are located at depth of up to 15 m). Obtained results indicate that the area P5 to P8, as well as P12 and P13, has a concentration of total petroleum hydrocarbons greater that the remediation value standardized as 0,6 mg/L. It was also determined that the total volume of the contaminated underground water is around 105.000m3. All of the above indicates that it is necessary to start the remediation of underground water contaminated with petroleum hydrocarbons and that the most appropriate remediation procedure for this site is in situ bioremediation.
AB  - Predmet ovog istraživanja je ispitivanje kvaliteta podzemnih voda na lokalitetu toplane 'Novi Beograd' (Srbija). Istraživanjima je obuhvaćen sistem od 10 pijezometara (P1, P5, P6, P7, P8, P9, P10, P11, P12, P13), koji su konstruisani u dva ciklusa (P1, P5, P6 i P13 do dubine od 10 metara i od P7 d o P12 do dubine od 15 metara). Dobijeni rezultati pokazuju da je oblast u kojoj se nalaze pijezometri od P5 do P8, kao i P12 i P13, oblast u kojoj je koncentracija ukupnih ugljovodonika nafte veća od remedijacione vrednosti koja je normirana na 0,6 mg/L. Takođe, utvrđeno je da je ukupna zapremina kontaminirane podzemne vode o ko 105.000 m 3. Sve navedeno ukazuje da je neophodno pristupiti sanaciji podzemne vode kontaminirane ugljovodonicima nafte, kao i da je najoptimalniji postupak za navedeni lokalitet in situ bioremedijacija.
PB  - Belgrade, Serbia : Engineering Society for Corrosion
T2  - Zaštita materijala
T1  - Monitoring of underground water: Necessary step in determining the method for site remediation
T1  - Monitoring podzemnih voda - neophodan korak u utvrđivanju načina sanacije kontaminiranog lokaliteta
VL  - 57
IS  - 3
SP  - 389
EP  - 396
DO  - 10.5937/ZasMat1603389A
ER  - 
@article{
author = "Avdalović, Jelena and Miletić, Srđan B. and Ilić, Mila and Milić, Jelena and Šolević-Knudsen, Tatjana and Đurić, Aleksandra and Nešković, Dejan and Vrvić, Miroslav",
year = "2016",
abstract = "The object of this study was to investigate the quality of underground water on the location of heating plant 'Novi Beograd' (Serbia). The examination included a system of 10 piezometers (P1, P5, P6, P7, P8, P9, P10, P11, P12, P13), which are constructed in two cycles (P1, P5, P6 and P13 are located at depth of up to 10 m, and P7 to P12 are located at depth of up to 15 m). Obtained results indicate that the area P5 to P8, as well as P12 and P13, has a concentration of total petroleum hydrocarbons greater that the remediation value standardized as 0,6 mg/L. It was also determined that the total volume of the contaminated underground water is around 105.000m3. All of the above indicates that it is necessary to start the remediation of underground water contaminated with petroleum hydrocarbons and that the most appropriate remediation procedure for this site is in situ bioremediation., Predmet ovog istraživanja je ispitivanje kvaliteta podzemnih voda na lokalitetu toplane 'Novi Beograd' (Srbija). Istraživanjima je obuhvaćen sistem od 10 pijezometara (P1, P5, P6, P7, P8, P9, P10, P11, P12, P13), koji su konstruisani u dva ciklusa (P1, P5, P6 i P13 do dubine od 10 metara i od P7 d o P12 do dubine od 15 metara). Dobijeni rezultati pokazuju da je oblast u kojoj se nalaze pijezometri od P5 do P8, kao i P12 i P13, oblast u kojoj je koncentracija ukupnih ugljovodonika nafte veća od remedijacione vrednosti koja je normirana na 0,6 mg/L. Takođe, utvrđeno je da je ukupna zapremina kontaminirane podzemne vode o ko 105.000 m 3. Sve navedeno ukazuje da je neophodno pristupiti sanaciji podzemne vode kontaminirane ugljovodonicima nafte, kao i da je najoptimalniji postupak za navedeni lokalitet in situ bioremedijacija.",
publisher = "Belgrade, Serbia : Engineering Society for Corrosion",
journal = "Zaštita materijala",
title = "Monitoring of underground water: Necessary step in determining the method for site remediation, Monitoring podzemnih voda - neophodan korak u utvrđivanju načina sanacije kontaminiranog lokaliteta",
volume = "57",
number = "3",
pages = "389-396",
doi = "10.5937/ZasMat1603389A"
}
Avdalović, J., Miletić, S. B., Ilić, M., Milić, J., Šolević-Knudsen, T., Đurić, A., Nešković, D.,& Vrvić, M.. (2016). Monitoring of underground water: Necessary step in determining the method for site remediation. in Zaštita materijala
Belgrade, Serbia : Engineering Society for Corrosion., 57(3), 389-396.
https://doi.org/10.5937/ZasMat1603389A
Avdalović J, Miletić SB, Ilić M, Milić J, Šolević-Knudsen T, Đurić A, Nešković D, Vrvić M. Monitoring of underground water: Necessary step in determining the method for site remediation. in Zaštita materijala. 2016;57(3):389-396.
doi:10.5937/ZasMat1603389A .
Avdalović, Jelena, Miletić, Srđan B., Ilić, Mila, Milić, Jelena, Šolević-Knudsen, Tatjana, Đurić, Aleksandra, Nešković, Dejan, Vrvić, Miroslav, "Monitoring of underground water: Necessary step in determining the method for site remediation" in Zaštita materijala, 57, no. 3 (2016):389-396,
https://doi.org/10.5937/ZasMat1603389A . .
1
1